 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|

Use the menu at right to browse
our listings. |
 |
|
|
 |

BCE provided full service Structural Engineering
services for Missoula County Public Schools on
a Library,
Gymnasium and Office addition at Big Sky High
School. Several miscellaneous upgrades occurred
within the building as well. The elevated floors
of the addition were framed with composite steel
beams with concrete slab over steel decking. The
roof was framed with structural steel beams and
open web steel joists. The $3.8 Million addition
was completed in the latter part of 2002. |
Additional Photos:
 |
|
|
|
 |
 |
 |
 |
 |
 |
|
|
 |
  |
 |