Eglise Bridge – Yellowstone Club, Big Sky, MT

Design Team: BCE Structural, TrueNorth Steel, Lorenzen Soil Mechanics, Inc., Houser Engineering, PC, and Jackson Contractor Group, Inc.
Owner: Yellowstone Club Development
Completion Date: December 2016

The scope of our work included the preliminary design of 3 bridge configuration options, as well as the final design of a deck-arch bridge to span the wetlands and Muddy Creek from the main lodge area of the Yellowstone Club to the future Eglise Mountain development. The total bridge length is 500 feet and 39 feet wide and includes a two way drive lane plus a pedestrian pathway. BCE and other members of the design team partnered to provide the owner with a full design-build package for the final deck-arch configuration.

Comments are closed.

%d bloggers like this: